Begonia Oil Field Project Profile
Location
The Begonia oil field is located in block 17/06 of the Lower Congo Basin, approximately 150 kilometers off the coast of Angola. The field is situated in water depths ranging from 400 to 750 meters.
Project Details
- Operator and Ownership: The project is operated by TotalEnergies, which holds a 30% interest in the block. Other partners include Sonangol P&P (30%), Sonangol Sinopec International (27.5%), Somoil Bloco (5%), Falcon Oil (5%), and PTT Exploration and Production (PTTEP, 2.5%). However, Somoil Bloco is set to acquire PTTEP's 2.5% interest, increasing its stake to 7.5% upon the completion of the transaction.
Development Plan
- Wells and Infrastructure: The Begonia oil field will be developed as a subsea tieback to the existing Pazflor FPSO (Floating Production, Storage, and Offloading) vessel. The development involves five wells: three production wells and two water injection wells. These wells will be connected to the Pazflor FPSO through a 20km-long multi-phase production flowline, with the water injection wells linked to an existing riser.
Production Capacity
- Expected Production: The Begonia field is expected to produce up to 30,000 barrels of oil per day (bopd), which will be added to the Pazflor FPSO's production capacity.
Pazflor FPSO
- Details: The Pazflor FPSO, operated by TotalEnergies, is located in block 17 and has been operational since August 2011. It is spread-moored in 760 meters deep waters. The FPSO has an oil production capacity of 220,000 bopd, a water injection capacity of 382,000 bopd, and a crude storage capacity of 1.9 million barrels. The vessel was constructed by Daewoo Shipbuilding & Marine Engineering and measures 325 meters long, 61 meters wide, and 32 meters high.
Investment and Workforce
- Final Investment Decision (FID): TotalEnergies announced the final investment decision for the Begonia oil field development in July 2022, with an initial investment estimated at $850 million. The project involves 1.3 million man-hours of work, with approximately 70% of the work to be carried out in Angola.
Contractors and Services
- McDermott International: Awarded a contract to supply subsea systems, including engineering, procurement, supply, construction, and installation services for the subsea umbilicals, water injection, and production flowlines. The project management and engineering works will be conducted in London and Kuala Lumpur, with fabrication work planned locally in Angola. The subsea construction vessel North Ocean 102 and the dynamically positioned construction vessel Amazon will be used for the installation.
Standardization and Cost Efficiency
- The Begonia project is the second TotalEnergies-operated project in Angola to use a standardized subsea production system, following the CLOV Phase 3 development. This standardization is expected to offer cost savings of up to 20% and shorter lead times for equipment delivery.
Timeline
- Production Start: The Begonia oil field is scheduled to commence production in late 2024.
Environmental and Strategic Context
- The project is part of TotalEnergies' multi-energy strategy in Angola, which includes not only oil and gas developments but also renewable energy projects. The Begonia development aligns with the company's goals of producing energy with low carbon intensity and supporting Angola's sustainable energy transition.