E17a-A

  • Type: Rig
  • field
  • Latitude: 54.0960000
  • Longitude: 3.3680000

Location

The E17a-A platform is located in the Dutch sector of the North Sea, which is part of the Dutch Continental Shelf.

Operator

The platform is operated by GDF Suez (now part of ENGIE), although the specific operational responsibilities may have evolved over time due to changes in the energy sector.

Projects and Maintenance

Conbit, a specialized engineering and services company, has been involved in several projects related to the E17a-A platform. Here are some of the notable projects:

  • Offshore Skidding Compressor Module: Conbit was contracted to handle the offshore skidding compressor module project on the E17a-A platform.
  • Structural Integrity: Conbit was also involved in checking the structural integrity of the helideck on the L10-A platform, which, while not specifically the E17a-A, indicates their expertise in similar platforms in the same region.

Scope of Work

The projects undertaken by Conbit on or related to the E17a-A platform typically involve:

  • Engineering and Lifting Operations: Conbit has expertise in engineering lifting plans and executing lifting operations, which would be crucial for installing or replacing equipment on the platform.
  • Compressor Module Installation: The specific project of skidding a compressor module involves complex engineering and logistical tasks to ensure the safe and efficient installation of the module.

Safety and Regulatory Compliance

Given the location in the North Sea, projects on the E17a-A platform would need to comply with stringent safety and environmental regulations. Companies involved, such as Conbit, must adhere to industry standards and best practices to ensure the integrity and safety of the platform and its operations.

Environmental Considerations

The North Sea is a sensitive environmental area, and any operations on the E17a-A platform would need to align with environmental protection policies. For instance, TotalEnergies, another major player in the region, has set ambitious targets for reducing methane emissions and eliminating routine flaring, which could influence the operational practices on such platforms.

Conclusion

The E17a-A oil project involves complex offshore operations, including the installation and maintenance of critical equipment such as compressor modules. The project requires specialized engineering, lifting operations, and a strong focus on safety and environmental compliance. Companies like Conbit play a crucial role in ensuring these operations are carried out efficiently and safely.

Flag Name Type Date
BOS BASE Cargo 9/21/2024
BOS BASE Cargo 8/12/2024
GLOMAR ENDURANCE Port 8/11/2024
GLOMAR ARCTIC Port 7/31/2024
GLOMAR ARCTIC Port 7/30/2024
GLOMAR ARCTIC Port 7/29/2024
BOS POOL Cargo 7/27/2024
GLOMAR ARCTIC Port 7/27/2024
Accept Reject