G17cd-A

  • Type: Rig
  • field
  • Latitude: 54.0490000
  • Longitude: 5.4400000

Project Overview

  • Project Name: G17cd-A Oil Project
  • Location: Specify the geographical location, including the country, region, and any relevant coordinates.
  • Operator: Name of the company or consortium operating the project.
  • Partners: List any other companies or entities involved in the project.
  • Discovery Year: The year in which the oil field was discovered.
  • Production Start Year: The year when oil production began.

Geographical and Geological Details

  • Field Type: Whether it is an onshore or offshore field.
  • Geological Formation: Describe the geological formation where the oil is located, including the type of rock and the age of the formation.
  • Reservoir Characteristics: Details about the reservoir rock, porosity, permeability, and any other relevant geological features.
  • Water Depth (if offshore): The depth of the water at the project location.

Production Details

  • Estimated Reserves: The estimated amount of oil reserves in the field.
  • Daily Production Capacity: The maximum daily production rate of the field.
  • Production Method: Describe the method used for extracting oil, such as primary recovery, secondary recovery (water injection), or enhanced oil recovery (EOR) techniques.
  • Infrastructure: Details about the production facilities, pipelines, storage tanks, and any other infrastructure supporting the project.

Economic and Financial Aspects

  • Investment Cost: The total investment required for the project, including exploration, development, and production costs.
  • Revenue Projections: Estimated annual revenue from the project based on current oil prices and production rates.
  • Break-Even Analysis: The point at which the project becomes profitable.
  • Funding Sources: Details on how the project is financed, including any loans, equity investments, or partnerships.

Environmental and Social Impact

  • Environmental Impact Assessment: Summary of the environmental impact study, including potential risks and mitigation strategies.
  • Social Impact: Effects on local communities, including employment opportunities, community development projects, and any relocation or compensation plans.
  • Regulatory Compliance: Information on compliance with local and international environmental and social regulations.

Technological and Operational Details

  • Drilling and Completion: Details about the drilling and well completion techniques used.
  • Production Technology: Description of the technology used for oil extraction, processing, and transportation.
  • Safety Measures: Overview of the safety protocols and emergency response plans in place.
  • Maintenance and Upkeep: Strategies for maintaining the production facilities and ensuring continuous operation.

Timeline and Milestones

  • Exploration Phase: Timeline of exploration activities leading to the discovery.
  • Development Phase: Key milestones during the development phase, including the construction of infrastructure.
  • Production Phase: Important dates and milestones since the start of production.
  • Future Plans: Any planned expansions, upgrades, or new developments within the project.

Regulatory and Legal Framework

  • Licensing and Permits: Details about the licenses and permits obtained for the project.
  • Regulatory Bodies: Names of the regulatory bodies overseeing the project.
  • Compliance: Information on how the project complies with local and international laws and regulations.

Example Profile

Project Overview

  • Project Name: G17cd-A Oil Project
  • Location: Offshore, Gulf of Mexico, USA
  • Operator: ExxonMobil
  • Partners: Chevron, BP
  • Discovery Year: 2015
  • Production Start Year: 2020

Geographical and Geological Details

  • Field Type: Offshore
  • Geological Formation: Miocene sandstones
  • Reservoir Characteristics: Porosity of 25%, permeability of 100 md
  • Water Depth: 1,500 meters

Production Details

  • Estimated Reserves: 500 million barrels
  • Daily Production Capacity: 50,000 barrels per day
  • Production Method: Water injection for secondary recovery
  • Infrastructure: Includes a production platform, subsea wells, and a pipeline to a processing facility

Economic and Financial Aspects

  • Investment Cost: $5 billion
  • Revenue Projections: $1.5 billion annually at $70 per barrel
  • Break-Even Analysis: Expected to break even within 5 years of production
  • Funding Sources: Equity investments from partners and a $2 billion loan from a consortium of banks

Environmental and Social Impact

  • Environmental Impact Assessment: Identified potential risks to marine life; mitigation includes regular monitoring and habitat restoration programs
  • Social Impact: Created 500 jobs during the construction phase; ongoing community development projects in nearby coastal towns
  • Regulatory Compliance: Compliant with all relevant U.S. and international environmental regulations

Technological and Operational Details

  • Drilling and Completion: Used advanced directional drilling techniques
  • Production Technology: Employing subsea production systems and real-time monitoring
  • Safety Measures: Implementing rigorous safety protocols and regular emergency drills
  • Maintenance and Upkeep: Scheduled maintenance every 6 months; continuous monitoring of equipment

Timeline and Milestones

  • Exploration Phase: 2012-2015
    • Seismic surveys in 2012
    • Exploratory drilling in 2013
    • Discovery in 2015
  • Development Phase: 2016-2020
    • Platform construction in 2017
    • Installation of subsea infrastructure in 2018
    • Completion of production facilities in 2019
  • Production Phase: Started in 2020
    • Reached full production capacity in 2021
  • Future Plans: Planned expansion to include additional wells by 2025

Regulatory and Legal Framework

  • Licensing and Permits: Obtained necessary permits from the U.S. Bureau of Safety and Environmental Enforcement (BSEE) and the U.S. Environmental Protection Agency (EPA)
  • Regulatory Bodies: BSEE, EPA, and the U.S. Coast Guard
  • Compliance: Compliant with all relevant U.S. federal and state regulations.
Flag Name Type Date
DINA SCOUT baycraft 11/5/2024
ACE KRISTIANSAND Other 9/20/2024
DINA MERKUR Cargo 9/7/2024
BOS POOL Cargo 8/27/2024
DINA SUPPORTER baycraft 8/13/2024
DINA MERKUR Cargo 8/6/2024
DINA SUPPORTER baycraft 6/25/2024
DINA SUPPORTER baycraft 6/25/2024
Accept Reject