G17cd-A
- Type: Rig
- field
- Latitude: 54.0490000
- Longitude: 5.4400000
Project Overview
- Project Name: G17cd-A Oil Project
- Location: Specify the geographical location, including the country, region, and any relevant coordinates.
- Operator: Name of the company or consortium operating the project.
- Partners: List any other companies or entities involved in the project.
- Discovery Year: The year in which the oil field was discovered.
- Production Start Year: The year when oil production began.
Geographical and Geological Details
- Field Type: Whether it is an onshore or offshore field.
- Geological Formation: Describe the geological formation where the oil is located, including the type of rock and the age of the formation.
- Reservoir Characteristics: Details about the reservoir rock, porosity, permeability, and any other relevant geological features.
- Water Depth (if offshore): The depth of the water at the project location.
Production Details
- Estimated Reserves: The estimated amount of oil reserves in the field.
- Daily Production Capacity: The maximum daily production rate of the field.
- Production Method: Describe the method used for extracting oil, such as primary recovery, secondary recovery (water injection), or enhanced oil recovery (EOR) techniques.
- Infrastructure: Details about the production facilities, pipelines, storage tanks, and any other infrastructure supporting the project.
Economic and Financial Aspects
- Investment Cost: The total investment required for the project, including exploration, development, and production costs.
- Revenue Projections: Estimated annual revenue from the project based on current oil prices and production rates.
- Break-Even Analysis: The point at which the project becomes profitable.
- Funding Sources: Details on how the project is financed, including any loans, equity investments, or partnerships.
Environmental and Social Impact
- Environmental Impact Assessment: Summary of the environmental impact study, including potential risks and mitigation strategies.
- Social Impact: Effects on local communities, including employment opportunities, community development projects, and any relocation or compensation plans.
- Regulatory Compliance: Information on compliance with local and international environmental and social regulations.
Technological and Operational Details
- Drilling and Completion: Details about the drilling and well completion techniques used.
- Production Technology: Description of the technology used for oil extraction, processing, and transportation.
- Safety Measures: Overview of the safety protocols and emergency response plans in place.
- Maintenance and Upkeep: Strategies for maintaining the production facilities and ensuring continuous operation.
Timeline and Milestones
- Exploration Phase: Timeline of exploration activities leading to the discovery.
- Development Phase: Key milestones during the development phase, including the construction of infrastructure.
- Production Phase: Important dates and milestones since the start of production.
- Future Plans: Any planned expansions, upgrades, or new developments within the project.
Regulatory and Legal Framework
- Licensing and Permits: Details about the licenses and permits obtained for the project.
- Regulatory Bodies: Names of the regulatory bodies overseeing the project.
- Compliance: Information on how the project complies with local and international laws and regulations.
Example Profile
Project Overview
- Project Name: G17cd-A Oil Project
- Location: Offshore, Gulf of Mexico, USA
- Operator: ExxonMobil
- Partners: Chevron, BP
- Discovery Year: 2015
- Production Start Year: 2020
Geographical and Geological Details
- Field Type: Offshore
- Geological Formation: Miocene sandstones
- Reservoir Characteristics: Porosity of 25%, permeability of 100 md
- Water Depth: 1,500 meters
Production Details
- Estimated Reserves: 500 million barrels
- Daily Production Capacity: 50,000 barrels per day
- Production Method: Water injection for secondary recovery
- Infrastructure: Includes a production platform, subsea wells, and a pipeline to a processing facility
Economic and Financial Aspects
- Investment Cost: $5 billion
- Revenue Projections: $1.5 billion annually at $70 per barrel
- Break-Even Analysis: Expected to break even within 5 years of production
- Funding Sources: Equity investments from partners and a $2 billion loan from a consortium of banks
Environmental and Social Impact
- Environmental Impact Assessment: Identified potential risks to marine life; mitigation includes regular monitoring and habitat restoration programs
- Social Impact: Created 500 jobs during the construction phase; ongoing community development projects in nearby coastal towns
- Regulatory Compliance: Compliant with all relevant U.S. and international environmental regulations
Technological and Operational Details
- Drilling and Completion: Used advanced directional drilling techniques
- Production Technology: Employing subsea production systems and real-time monitoring
- Safety Measures: Implementing rigorous safety protocols and regular emergency drills
- Maintenance and Upkeep: Scheduled maintenance every 6 months; continuous monitoring of equipment
Timeline and Milestones
- Exploration Phase: 2012-2015
- Seismic surveys in 2012
- Exploratory drilling in 2013
- Discovery in 2015
- Development Phase: 2016-2020
- Platform construction in 2017
- Installation of subsea infrastructure in 2018
- Completion of production facilities in 2019
- Production Phase: Started in 2020
- Reached full production capacity in 2021
- Future Plans: Planned expansion to include additional wells by 2025
Regulatory and Legal Framework
- Licensing and Permits: Obtained necessary permits from the U.S. Bureau of Safety and Environmental Enforcement (BSEE) and the U.S. Environmental Protection Agency (EPA)
- Regulatory Bodies: BSEE, EPA, and the U.S. Coast Guard
- Compliance: Compliant with all relevant U.S. federal and state regulations.
Flag | Name | Type | Date |
---|---|---|---|
DINA SCOUT | baycraft | 11/5/2024 | |
ACE KRISTIANSAND | Other | 9/20/2024 | |
DINA MERKUR | Cargo | 9/7/2024 | |
BOS POOL | Cargo | 8/27/2024 | |
DINA SUPPORTER | baycraft | 8/13/2024 | |
DINA MERKUR | Cargo | 8/6/2024 | |
DINA SUPPORTER | baycraft | 6/25/2024 | |
DINA SUPPORTER | baycraft | 6/25/2024 |