K12-G
- Type: Rig
- field
- Latitude: 53.3600000
- Longitude: 3.9750000
Project Overview
- Project Name: Specify the name of the project, e.g., "Troy K-12 School Renovation Project."
- Location: Include the address and location of the school.
- Project Type: Indicate whether it is a new construction, renovation, or expansion project.
- Project Goals: Outline the primary objectives of the project, such as improving educational facilities, enhancing safety, or increasing capacity.
Project Team
- Construction Manager: Identify the construction manager and their contact information.
- Project Manager: Name the project manager and their contact details.
- Architect: Mention the architectural firm responsible for the design, e.g., TMP Architecture, Inc..
- Contractors: List the main contractors involved in the project.
- Engineers: Specify the engineering firms or individuals involved in various aspects such as structural, mechanical, and electrical engineering.
Scope of Work
- Demolition: Describe any demolition work required, including the areas to be demolished and the timeline.
- Construction Phases: Outline the different phases of the project, such as site preparation, foundation work, framing, installation of electrical and plumbing systems, and finishing work.
- Divisions of Work: Break down the project into specific divisions as outlined in the construction documents, such as:
- Division 03: Concrete
- Division 05: Metals
- Division 06: Wood, Plastics, and Composites
- Division 07: Thermal and Moisture Protection
- Division 08: Openings
- Division 09: Finishes.
Timeline and Milestones
- Start Date: Specify the project start date.
- Completion Date: Provide the anticipated completion date.
- Key Milestones: List significant milestones, such as completion of foundation work, installation of roofing, and final inspections.
Budget and Funding
- Total Budget: State the total budget allocated for the project.
- Funding Sources: Identify the sources of funding, whether from public funds, private donations, or a combination of both.
Submittals and Documentation
- RFI Process: Describe the process for submitting Requests for Information (RFIs), including the required format and the log to track RFIs.
- Submittal Procedures: Outline the procedures for submitting documents, samples, and other required information, including the use of transmittal forms.
- Closeout Submittals: Specify the documents required for project closeout, such as correction punch lists, operation and maintenance data, and warranties.
Safety and Quality Control
- Safety Protocols: Detail the safety protocols and regulations that must be followed during the project.
- Quality Control Measures: Describe the measures in place to ensure the quality of work, including inspections and testing.
Communication and Coordination
- Communication Plan: Outline the communication plan among the project team, including regular meetings and reporting requirements.
- Coordination Issues: Address how coordination issues will be resolved, such as through written and graphic solutions to scale.
Environmental and Regulatory Compliance
- Environmental Impact: Discuss any environmental impact assessments and compliance measures.
- Regulatory Compliance: Ensure compliance with local, state, and federal regulations, including those related to health and safety, and building codes.
Community Impact
- Community Engagement: Describe any community engagement activities or public meetings related to the project.
- Impact on Students and Staff: Outline how the project will affect the daily operations of the school and any temporary arrangements that will be made.
Flag | Name | Type | Date |
---|---|---|---|
ERNST HAGEDORN | Cargo | 9/21/2024 | |
NORTHERN MARIA | Other | 9/17/2024 | |
FS CRATHES | baycraft | 8/15/2024 |