L13-FG

  • Type: Rig
  • field
  • Latitude: 53.2960000
  • Longitude: 4.2790000

Project Overview

  • Project Name: L13-FG
  • Location: Specify the geographical location, including the country, region, and any relevant coordinates.
  • Operator/Developer: Name of the company or consortium responsible for the project.
  • Partners: List any joint venture partners or stakeholders involved.

Technical Details

  • Field Type: Whether it is an onshore or offshore field.
  • Reservoir Characteristics:
    • Formation: The geological formation where the oil is located.
    • Depth: The depth of the reservoir.
    • Pressure and Temperature: Initial reservoir pressure and temperature.
  • Hydrocarbon Composition:
    • C1-C7+: Breakdown of methane (C1), ethane (C2), propane (C3), butane (C4), hexanes (C6), and heavy hydrocarbon components (C7+).

Exploration and Development

  • Discovery Date: When the field was discovered.
  • Exploration Wells: Details of any exploration wells drilled, including results and logs (e.g., core analysis log, caliper log, cement bond log).
  • Development Plan: Outline of the development strategy, including the number of production wells, injection wells, and any Enhanced Oil Recovery (EOR) methods planned.

Drilling and Completion

  • Drilling Program: Details of the drilling program, including the drilling report (DR), drilling proposal/progress report (DRLPR), and any specific drilling techniques used (e.g., directional drilling, deviated wells).
  • Well Completion: Information on well completion and equipment cost (C&E), casing and suspension (C&S), and any specific completion techniques or tools used (e.g., casing collar locator, cement evaluation).

Production

  • Production Rate: Expected or current production rates in barrels of oil per day (BOPD) or barrels of liquid per day (BLPD).
  • Facilities: Description of the production facilities, including processing plants, storage tanks, and transportation infrastructure.

Environmental and Regulatory

  • Environmental Impact Assessment (EIA): Summary of the environmental impact assessment, including any mitigation measures and compliance with regulations such as the Clean Air Act (CAA) and other local environmental laws.
  • Permits and Approvals: List of necessary permits and approvals obtained, including any contract authorization approval forms (CAAF).

Health, Safety, and Security

  • Safety Plan: Overview of the health, safety, and security plan, including emergency evacuation plans (EEP), escape, evacuation, and rescue analysis (EERA), and any other safety protocols in place.

Economic and Financial

  • Capital Expenditure: Estimated capital expenditure for the project.
  • Operating Costs: Breakdown of expected operating costs, including maintenance, personnel, and other expenses.
  • Revenue Projections: Projected revenue based on production rates and oil prices.

Project Timeline

  • Timeline: Key milestones and deadlines for the project, including exploration, development, production start-up, and any significant maintenance or expansion plans.
Accept Reject