Lagosta
- Type: Rig
- field
- Latitude: -10.9377000
- Longitude: 41.0412000
Location
The Lagosta oil project is located in the Rovuma basin, specifically in Offshore Area 1 of Mozambique.
Depth and Water Depth
The Lagosta-2 well, which is part of the Lagosta project, reached a depth of 14,223 feet in water depths of 4,813 feet.
Operators and Partnerships
While the specific operators and partnerships for the Lagosta project are not detailed in the provided sources, it is common for such projects in the Rovuma basin to involve international partnerships. For example, projects in this region often include companies like Anadarko (now part of Occidental Petroleum), ENI, and other major oil and gas companies.
Status and Future Use
The Lagosta-2 well has been preserved for future use, indicating that the site has potential for further development and production.
Geographical Context
The Rovuma basin is a significant hydrocarbon province, and the Lagosta project is one of the several offshore projects in this area. Mozambique, despite not producing crude oil or having refining capacity itself, has substantial offshore oil and gas reserves.
Field Characteristics
The Lagosta and Merluza fields, which are related projects, are described as being in shallow waters. However, the Lagosta-2 well's depth and water depth suggest that the project involves deepwater exploration and production activities.
Given the lack of detailed specific information on the Lagosta project in the provided sources, here is a summarized profile:
- Location: Offshore Area 1, Rovuma basin, Mozambique
- Depth and Water Depth: 14,223 feet depth in 4,813 feet of water
- Status: Preserved for future use
- Geographical Context: Part of the significant hydrocarbon reserves in the Rovuma basin
- Field Characteristics: Deepwater project, with the fields located in shallow waters but involving deepwater drilling
For more detailed information, such as the specific operators, production timelines, and other technical details, additional sources or direct information from the project's operators would be necessary.