Platong
- Type: Rig
- field
- Latitude: 9.9740920
- Longitude: 101.1634820
Location
The Platong II Gas Field is located in the Gulf of Thailand, as part of the existing Platong gas field complex.
Project Overview
The Platong II Gas Project is an expansion of the existing Platong Gas Field. This project aims to increase the production capacity of the gas field, which is a major natural gas reserve in the region.
Investment and Costs
The project involves a substantial investment of US$3.1 billion, reflecting the scale and complexity of the expansion.
Production Targets
The expansion is expected to ramp up production significantly. The project targets an increased production rate, although the exact current production figures are not specified in the sources. However, it is mentioned that the project aims to achieve a production level of 330 million standard cubic feet per day (MMscfd) as part of the expansion.
Development Details
The Platong II Gas Project involves the development of new wells and infrastructure to support the increased production. This includes the installation of new platforms, pipelines, and other necessary facilities to handle the expanded gas output.
Operators and Stakeholders
While the specific operators and stakeholders for the Platong II Gas Project are not detailed in the provided sources, it is common for such large-scale projects to involve multiple international and local energy companies, as well as government entities.
Technological and Infrastructure Aspects
The project likely involves advanced technologies to enhance gas recovery and processing. This includes the use of modern drilling techniques, gas processing facilities, and transportation infrastructure such as pipelines to deliver the gas to market.
Environmental and Safety Considerations
As with any major energy project, the Platong II Gas Project would need to adhere to stringent environmental and safety regulations. This includes measures to minimize the project's impact on the marine environment and ensure the safety of the workforce and surrounding communities.
In summary, the Platong II Gas Project is a significant expansion of the existing Platong Gas Field in the Gulf of Thailand, aimed at increasing natural gas production through substantial investment and the deployment of advanced technologies.