Q16-FA

  • Type: Rig
  • field
  • Latitude: 52.0640000
  • Longitude: 4.0460000

Project Overview

  • Project Name: Q16-FA Oil Project
  • Location: Specify the geographical location of the oil field.
  • Project Type: Oil field development project, which could involve exploration, appraisal, development, and production phases.

Project Objectives

  • Primary Objective: To develop and produce oil from the Q16-FA field in a safe, efficient, and economically viable manner.
  • Secondary Objectives:
    • To maximize the recovery of petroleum resources.
    • To ensure compliance with environmental and regulatory standards.
    • To optimize project timelines and costs.

Resource Classification

  • Resource Categories: Use the Petroleum Resources Management System (PRMS) guidelines to classify the resources into Proved (1P), Probable (2P), and Possible (3P) reserves, as well as Contingent Resources and Prospective Resources.

Development Plan

  • Development Strategy: Outline the overall strategy for developing the field, including the number of wells, drilling schedule, and production facilities.
    • Well Planning: Detail the number and type of wells (e.g., vertical, horizontal, injector wells).
    • Production Facilities: Describe the infrastructure needed, such as processing plants, pipelines, and storage facilities.
    • Phased Development: If applicable, explain any phased approach to the development, including primary and secondary recovery methods.

Commercial Evaluation

  • Economic Feasibility: Conduct a detailed economic evaluation to determine the commercial viability of the project, including capital expenditures, operating costs, and revenue projections.
  • Risk Assessment: Identify and assess the risks associated with the project, such as geological risks, operational risks, and market risks.

Technical Details

  • Reservoir Characteristics: Provide details on the reservoir properties, including rock type, porosity, permeability, and fluid properties.
  • Production Forecast: Estimate the production rates and cumulative production over the life of the field.
  • Production Operations: Describe the production operations, including well management, water injection (if applicable), and gas handling.

Environmental and Regulatory Considerations

  • Environmental Impact: Assess the potential environmental impacts of the project and outline measures to mitigate them.
  • Regulatory Compliance: Ensure compliance with all relevant environmental and safety regulations.

Project Timeline

  • Milestone Dates: Outline key milestones such as project approval, spud dates for wells, first oil, and peak production.
  • Project Phases: Break down the project into distinct phases (e.g., exploration, appraisal, development, production, and abandonment).

Financial and Investment Details

  • Capital Expenditure: Estimate the total capital required for the project, including drilling, facilities, and infrastructure costs.
  • Funding Sources: Identify the funding sources, whether through internal resources, loans, or partnerships.
  • Return on Investment: Calculate the expected return on investment (ROI) and other financial metrics to justify the project.

Stakeholders and Partnerships

  • Project Partners: List any joint venture partners, contractors, or service providers involved in the project.
  • Stakeholder Engagement: Outline the plan for engaging with local communities, regulatory bodies, and other stakeholders.

Safety and Risk Management

  • Safety Plan: Develop a comprehensive safety plan to ensure the safety of personnel and the environment.
  • Risk Management: Implement a risk management plan to identify, assess, and mitigate risks throughout the project lifecycle.
Flag Name Type Date
YE82 MAATJE V LIERE Fishing 11/12/2024
ZZ10 DE 4 GEBROEDERS Fishing 11/8/2024
YE58 ICHTHUS Fishing 11/7/2024
CHEEKYTATOO SOLO Sailing 11/6/2024
YE257 SOLI DEOGLORIA Fishing 11/6/2024
WATER LILLY Sailing 11/6/2024
BRU23MATTHEUS Fishing 11/5/2024
ZK23 SEMPER FIDELIS Fishing 11/4/2024
BRU 48 ADRIAAN Fishing 10/31/2024
ZZ-6 NOOITGEDACHT Fishing 10/31/2024
BRU 48 ADRIAAN Fishing 10/29/2024
BRU-8 MARINUS Fishing 10/22/2024
BRU50 WISSELVAL Fishing 10/21/2024
LA VEUVE NOIRE Pleasure 10/18/2024
OPALINE Cargo 10/17/2024
BRU-8 MARINUS Fishing 10/17/2024
BRU 48 ADRIAAN Fishing 10/17/2024
CALYPSO Pleasure 10/15/2024
JEL Passenger 10/15/2024
BRU-14 Fishing 10/14/2024
SCYLLA Pleasure 10/6/2024
SHORE EASE baycraft 10/5/2024
LINEA Pleasure 10/5/2024
SHORE EASE baycraft 10/5/2024
WR10 JOHAN PRINS Fishing 10/2/2024
MULTRASHIP PROTECTOR Towing/Tug 10/2/2024
WR181 ELISABETH Fishing 10/2/2024
TH48 VIER GEBROEDERS Fishing 9/30/2024
OCEAN PROTECTOR Cargo 9/30/2024
KEA Sailing 9/28/2024
MULTRASHIP PROTECTOR Towing/Tug 9/23/2024
CONDOR Other 9/23/2024
KUBAKI Pleasure 9/22/2024
PIMIENTOS Sailing 9/21/2024
TOGETHER Pleasure 9/21/2024
MISCHIEF Sailing 9/20/2024
MAORE Sailing 9/20/2024
Z56 PIETER Fishing 9/20/2024
YE 96 JAN PRINS Fishing 9/19/2024
EKKE NEKKEPEN Sailing 9/19/2024
TRINITY ONE Sailing 9/16/2024
GEPKE IV Sailing 9/14/2024
BOSPHORUS Sailing 9/8/2024
HERMANO Sailing 9/8/2024
EN AVANT Sailing 9/7/2024
SEA CAT Sailing 9/6/2024
EENDRACHT Sailing 9/6/2024
HARTENDIEF Sailing 9/5/2024
SUPER NOVA Sailing 9/4/2024
ZZ-6 NOOITGEDACHT Fishing 9/3/2024
Accept Reject