SM115 - Cox
- Type: Rig
- asset
- Latitude: 28.4895000
- Longitude: -92.0405000
Project Overview
- Project Name: SM115 - Cox oil project
- Location: Specify the exact geographical location, including the state, county, and any relevant local details.
- Project Type: Oil extraction and production project.
Land Use and Environmental Impact
- Land Categories Affected: Similar to the Keystone XL project, this could include rangeland, agricultural lands, forest land, and other types of land. For example:
- Rangeland: X miles
- Agricultural lands: Y miles
- Forest land: Z miles
- Construction ROW and Easements: Details on the width of the construction right-of-way (ROW), temporary and permanent easements, and any adjustments to avoid or reduce impacts on sensitive areas like wetlands, cultural sites, and residential areas.
Construction Details
- Pipeline Specifications: If applicable, include the diameter of the pipeline, material used, and any other relevant technical specifications.
- Construction Schedule: Estimated duration for construction, including the time required for each phase and the overall project timeline.
- Workforce and Resources: Number of workers involved, equipment needed, and any temporary facilities such as construction camps, pipe storage sites, and contractor yards.
Environmental Considerations
- Tree Removal and Regrowth: Policies on tree removal, consultation with landowners, and plans for regrowth in temporary ROW areas.
- Wetlands and Cultural Sites: Measures to protect these areas during construction.
- Compliance with Regulations: Adherence to local, state, and federal environmental regulations and permits required.
Landowner and Community Impact
- Landowner Consultation: Processes for consulting with landowners regarding easements, tree removal, and other impacts.
- Community Engagement: Plans for engaging with local communities, addressing concerns, and providing compensation or benefits.
Operational Details
- Pump Stations and Facilities: Locations and specifications of pump stations, delivery facilities, and other operational infrastructure.
- Maintenance and Monitoring: Plans for ongoing maintenance, monitoring, and safety measures post-construction.
Economic and Social Impact
- Job Creation: Number of jobs created during the construction and operational phases.
- Economic Benefits: Estimated economic benefits to the local and regional economy.
- Social Impact: Potential social impacts on local communities, including any positive or negative effects.
Regulatory Compliance
- Permits and Approvals: List of necessary permits and approvals from local, state, and federal authorities.
- Compliance with Standards: Adherence to industry standards and regulatory requirements.