SM115 - Cox

  • Type: Rig
  • asset
  • Latitude: 28.4895000
  • Longitude: -92.0405000

Project Overview

  • Project Name: SM115 - Cox oil project
  • Location: Specify the exact geographical location, including the state, county, and any relevant local details.
  • Project Type: Oil extraction and production project.

Land Use and Environmental Impact

  • Land Categories Affected: Similar to the Keystone XL project, this could include rangeland, agricultural lands, forest land, and other types of land. For example:
    • Rangeland: X miles
    • Agricultural lands: Y miles
    • Forest land: Z miles
  • Construction ROW and Easements: Details on the width of the construction right-of-way (ROW), temporary and permanent easements, and any adjustments to avoid or reduce impacts on sensitive areas like wetlands, cultural sites, and residential areas.

Construction Details

  • Pipeline Specifications: If applicable, include the diameter of the pipeline, material used, and any other relevant technical specifications.
  • Construction Schedule: Estimated duration for construction, including the time required for each phase and the overall project timeline.
  • Workforce and Resources: Number of workers involved, equipment needed, and any temporary facilities such as construction camps, pipe storage sites, and contractor yards.

Environmental Considerations

  • Tree Removal and Regrowth: Policies on tree removal, consultation with landowners, and plans for regrowth in temporary ROW areas.
  • Wetlands and Cultural Sites: Measures to protect these areas during construction.
  • Compliance with Regulations: Adherence to local, state, and federal environmental regulations and permits required.

Landowner and Community Impact

  • Landowner Consultation: Processes for consulting with landowners regarding easements, tree removal, and other impacts.
  • Community Engagement: Plans for engaging with local communities, addressing concerns, and providing compensation or benefits.

Operational Details

  • Pump Stations and Facilities: Locations and specifications of pump stations, delivery facilities, and other operational infrastructure.
  • Maintenance and Monitoring: Plans for ongoing maintenance, monitoring, and safety measures post-construction.

Economic and Social Impact

  • Job Creation: Number of jobs created during the construction and operational phases.
  • Economic Benefits: Estimated economic benefits to the local and regional economy.
  • Social Impact: Potential social impacts on local communities, including any positive or negative effects.

Regulatory Compliance

  • Permits and Approvals: List of necessary permits and approvals from local, state, and federal authorities.
  • Compliance with Standards: Adherence to industry standards and regulatory requirements.
Accept Reject