Storr

  • Type: Rig
  • field
  • Latitude: 59.3697285
  • Longitude: 1.6740984

Introduction and Overview

  • Project Name: Amiral Petrochemical Complex
  • Location: Jubail, Saudi Arabia
  • Partners: Saudi Aramco (62.5%) and TotalEnergies (37.5%).

Background and History

  • The project was announced following the final investment decision by Saudi Aramco and TotalEnergies in December 2022.
  • TotalEnergies has been present in Saudi Arabia since 1974 and continues to develop large-scale projects in the country.

Main Activities and Scope

  • The Amiral project involves the construction of a petrochemical complex integrated with the SATORP refinery.
  • Key components include:
    • A mixed-feed cracker capable of processing different grades of low-cost feedstocks, producing 1.65 million tons of ethylene per year.
    • Two polyethylene lines, each with a capacity of 500,000 tons per year.
    • Units for extracting butadiene and aromatics, and producing high value-added derivatives.

Feedstock and Supply

  • The complex will convert feedstock produced directly by the SATORP refinery, such as off-gases and naphtha, as well as ethane and light naphtha supplied by Saudi Aramco.

Economic and Employment Impact

  • The overall project, including the specialty chemicals park, will create 7,000 local direct and indirect jobs.
  • TotalEnergies and Saudi Aramco will provide training for these jobs.

Sustainability and Environmental Considerations

  • The project aims to reduce its environmental footprint, with special attention to carbon intensity.
  • Hydrogen co-produced by the steam cracker will replace methane used as a fuel in the SATORP refinery's furnaces, aligning with TotalEnergies' ambition of achieving carbon neutrality by 2050.

Project Timeline and Investment

  • Construction is scheduled to begin in 2023.
  • Commercial operation is planned for 2027.
  • The project represents an investment of $11 billion.

Integration with Local Industry

  • The complex will supply a park in the Jubail industrial area, where specialty chemical plants will be located.
  • This will support the creation of key manufacturing activities such as carbon fibers, lubricants, special fluids, detergents, additives, and automotive parts.

Services & Solutions

  • The project will enhance the local petrochemical industry by providing a range of high-value products.
  • It will also support downstream manufacturing activities through the supply of raw materials to the specialty chemicals park.

Facilities & Equipment

  • The project includes state-of-the-art facilities such as a mixed-feed cracker, polyethylene lines, and units for extracting butadiene and aromatics.
  • The use of advanced technology will ensure high efficiency and minimal environmental impact.

Contact Information

  • For more detailed information, contact can be made through the respective companies:
    • TotalEnergies: [TotalEnergies Contact Page]
    • Saudi Aramco: [Saudi Aramco Contact Page]
Accept Reject