Tumut

  • Type: Rig
  • field
  • Latitude: 19.1266277
  • Longitude: -92.3887028

Tumut 1 Hydro Power Project

  • This is a 329.6MW hydro power project located on the Tumut River in New South Wales, Australia.
  • The project is currently under rehabilitation and modernization and is owned by Snowy Hydro.
  • It consists of 4 turbines, each with an 82.4MW nameplate capacity, and a net head of 292.6m.
  • GE Renewable Energy is expected to supply the electric generators for the project.
  • The project was initially commissioned in 1959, but it is undergoing current rehabilitation.

Visy Pulp & Paper Tumut Mill

  • This is a pulp and paper mill located in Tumut, New South Wales, Australia, operated by Visy.
  • The mill has undergone expansions and modifications, with the current project approval allowing for a production capacity of up to 800,000 tonnes per year.
  • The mill has a detailed Solid Waste Management Plan and an Operational Environmental Management Plan (OEMP) based on the ISO 14001 Environmental Management System.

HumeLink East Project

  • This is a transmission infrastructure project in the region, but it does not involve oil production.
  • The project includes various work scopes such as earthworks, drainage, roadworks, and other construction activities across several locations including Yass, Adjungbilly, Gadara, and Bannaby.
Accept Reject