BATTERY PIER PONTOON

  • GBDGL
  • Latitude: 54.1525
  • Longitude: -4.47797
  • UK Coast & Atlantic
  • Marina in UK

Location: UK

Battery Pier Pontoon is a notable marine port facility located in the United Kingdom. Below is a detailed description and specification of the facility:

Description:

Battery Pier Pontoon is a floating structure used for docking and mooring vessels. It is positioned adjacent to Battery Pier, forming an integral part of the marine and port infrastructure. This facility is typically used by a range of vessels, including smaller recreational boats, yachts, and ferry services. The pontoon aids in the safe and efficient transfer of passengers and goods between the shore and watercraft.

Specifications:

Location:

  • Country: United Kingdom
  • Region: Commonly associated with ports near ferry terminals and marinas in coastal towns.

Structure:

  • Type: Floating pontoon
  • Material: Generally constructed from heavy-duty marine-grade materials such as steel, aluminum, or reinforced concrete.
  • Dimensions: Varies, but typically long enough to accommodate multiple vessels depending on the port's size and traffic.

Features:

  • Mooring Equipment: Equipped with mooring cleats, bollards, and fenders to secure vessels.
  • Access Points: Gangways and ramps for safe passenger movement on and off the pontoon.
  • Utilities: Availability of shore power, water supply, and sometimes fuel services depending on the pontoon's specific use.
  • Navigation Aids: Lighting and signage to aid navigation and ensure safety during docking procedures.
  • Safety: Life rings, emergency ladders, and potentially fire suppression equipment in accordance with local maritime regulations.

Usage:

  • Vessel Accommodation: Suitable for various vessel types, from small recreational boats to commercial ferries.
  • Passenger Services: Often used by ferry services for embarking and disembarking passengers.
  • Cargo Operations: Smaller scale goods transfer facilities may be present depending on the port's operational focus.

Environmental Considerations:

  • Designed to minimize impact on the local marine environment.
  • Waste management protocols to handle refuse from moored vessels responsibly.
  • Often installed with consideration to tidal ranges and local weather conditions to ensure longevity and operational reliability.

Regulations:

  • Compliance with UK maritime and environmental regulations ensuring safe and sustainable operations.
  • Regular inspections and maintenance to adhere to safety standards and extend operational life.

Additional Information:

  • Connectivity to nearby transportation hubs such as bus stations, car parks, and train stations.
  • Integrated services with local maritime operations, such as harbor master's office and marine rescue services.
  • May serve as a location for community events and marine-related activities.

Overall, Battery Pier Pontoon is a versatile and essential component of marine infrastructure in the UK, providing critical support for maritime activities, enhancing safety, and facilitating the efficient movement of people and goods.

Related Ports