GAS LILY

  • Vessel Type: Tanker
  • MMSI: 525801396
  • IMO: 9374882
  • Call sign: YDUT3

GAS LILY (IMO: 9374882) is a Tanker vessel sailing under the Indonesia flag. It has an overall length of 377 feets and a beam of 52 feets.


GAS LILY position reported at 05/07/2026 13:57:57 UTC:
Latitude: 105.952650, Longitude 105.952650 longitude

Visited ports: Suralaya Anch, Ciwandan Anch, Duta Pacific, Pasir Gudang Anch, Kertih Anch, Pengerang

Vessel Identification

  • MMSI: 525801396
  • IMO Number: 9374882
  • Call Sign: YDUT3
  • Vessel Type: LPG Tanker
  • Flag State: Indonesia
  • AIS Type: Tanker

Specifications

  • Gross Tonnage: 3,833 GT
  • Deadweight: 4,566 DWT
  • Length Overall: 99.9 m
  • Beam: 16.4 m
  • Draft: 6.1 m
  • Year Built: 2006

Propulsion

  • Engine Type: Motor Vessel (MV)
  • Propulsion: Single screw, diesel engine
  • Service Speed: approximately 12 knots

Shipyard

  • Built By: Shin Kurushima Dockyard Co., Ltd.
  • Country: Japan

Owner / Operator

  • Registered Owner: PT Pertamina Gas (Pertagas)
  • Operator: PT Pertamina Gas
  • Country of Domicile: Indonesia
  • AIS Class: Class A
  • GMDSS: Equipped
  • Navigation Status: Broadcasts via AIS transponder

Operating Region

  • Primary operations within Indonesian territorial waters and regional Southeast Asian sea lanes
  • Frequently transits the Java Sea, Strait of Malacca, and surrounding Indonesian archipelagic waters
  • Serves domestic LPG distribution routes supporting Indonesian energy infrastructure

Vessel Description

GAS LILY is an LPG tanker operating under the Indonesian flag, managed under the PT Pertamina Gas fleet. Built in 2006 at a Japanese shipyard, the vessel is designed for the carriage of liquefied petroleum gas in pressurized or semi-refrigerated tanks. As part of Indonesia's state energy logistics network, the vessel plays a role in domestic gas distribution across the Indonesian archipelago. The vessel transmits AIS data consistent with active tanker operations and maintains compliance with IMO registration requirements.

Port Type Date
SURALAYA ANCH Anchorage 5/7/2026
CIWANDAN ANCH Anchorage 4/26/2026
SURALAYA ANCH Anchorage 4/15/2026
DUTA PACIFIC Offshore Terminal 3/26/2026
PASIR GUDANG ANCH Anchorage 3/24/2026
SURALAYA ANCH Anchorage 3/11/2026
DUTA PACIFIC Offshore Terminal 2/21/2026
PASIR GUDANG ANCH Anchorage 2/19/2026
DUTA PACIFIC Offshore Terminal 2/9/2026
PASIR GUDANG ANCH Anchorage 2/7/2026
DUTA PACIFIC Offshore Terminal 1/28/2026
PASIR GUDANG ANCH Anchorage 11/26/2025
DUTA PACIFIC Offshore Terminal 10/26/2025
SURALAYA ANCH Anchorage 9/12/2025
PASIR GUDANG ANCH Anchorage 9/1/2025
SURALAYA ANCH Anchorage 8/19/2025
DUTA PACIFIC Offshore Terminal 8/5/2025
PASIR GUDANG ANCH Anchorage 7/1/2025
DUTA PACIFIC Offshore Terminal 6/17/2025
KERTIH ANCH Anchorage 6/4/2025
DUTA PACIFIC Offshore Terminal 5/31/2025
PASIR GUDANG ANCH Anchorage 5/9/2025
DUTA PACIFIC Offshore Terminal 2/11/2025
PENGERANG Port 1/31/2025
KERTIH ANCH Anchorage 1/1/2025