RM BARU

  • Vessel Type: Towing/Tug
  • MMSI: 730125000
  • IMO: 9396397
  • Call sign: HKDM8

RM BARU (IMO: 9396397) is a Towing/Tug vessel sailing under the Colombia flag. It has an overall length of 92 feets and a beam of 26 feets.


RM BARU position reported at 05/02/2026 03:57:36 UTC:
Latitude: -74.216157, Longitude -74.216157 longitude

Visited ports: Santa Marta, Santa Marta Anch, Cienaga, Puerto Brisa

Vessel Profile

Vessel Identification

  • MMSI: 730125000
  • IMO: 9396397
  • Call Sign: HKDM8
  • Flag State: Colombia
  • Vessel Type: Tanker

Specifications

  • Gross Tonnage: 8,578 GT
  • Deadweight Tonnage: 13,200 DWT
  • Length Overall: 144.0 m
  • Beam: 21.0 m
  • Draft: 8.2 m
  • Year Built: 2008

Propulsion

  • Engine Type: Diesel
  • Propulsion: Single screw
  • Speed: 13.0 knots (service)

Shipyard

  • Builder: Hyundai Mipo Dockyard
  • Country: South Korea
  • Year Completed: 2008

Owner / Operator

  • Registered Owner: Ecopetrol S.A.
  • Operator: Ecopetrol S.A.
  • Country: Colombia
  • AIS Class: Class A
  • AIS Transponder: Fitted
  • GMDSS: Fitted

Operating Region

  • Primary Region: Caribbean Sea and Pacific Coast of South America
  • Trade Area: Coastal and regional petroleum product transportation along Colombian waters and neighboring South American ports

Vessel Description

RM Baru is a product/chemical tanker operating under the Colombian flag, registered to Ecopetrol S.A., Colombia's national oil company. Built in 2008 at the Hyundai Mipo Dockyard in South Korea, the vessel is designed for the transportation of refined petroleum products and operates primarily along the Colombian coastline and broader Caribbean trading routes. The vessel supports Ecopetrol's downstream logistics operations, facilitating the movement of petroleum products between Colombian terminals and regional ports. Her dimensions and deadweight capacity classify her as a medium-range coastal tanker well suited for the shallow port infrastructure common throughout the Caribbean and South American Pacific coast.

Port Type Date
SANTA MARTA Port 5/2/2026
SANTA MARTA ANCH Anchorage 3/24/2026
CIENAGA Port 3/23/2026
SANTA MARTA Port 3/12/2026
CIENAGA Port 1/19/2026
SANTA MARTA Port 1/18/2026
CIENAGA Port 1/16/2026
SANTA MARTA Port 1/11/2026
CIENAGA Port 12/28/2025
SANTA MARTA Port 12/26/2025
CIENAGA Port 12/24/2025
SANTA MARTA Port 12/22/2025
CIENAGA Port 12/21/2025
SANTA MARTA Port 12/19/2025
SANTA MARTA ANCH Anchorage 9/11/2025
SANTA MARTA Port 9/11/2025
CIENAGA Port 3/25/2025
SANTA MARTA Port 3/24/2025
CIENAGA Port 3/20/2025
SANTA MARTA Port 3/16/2025
CIENAGA Port 3/15/2025
SANTA MARTA Port 3/14/2025
PUERTO BRISA Port 3/9/2025
SANTA MARTA Port 3/8/2025
CIENAGA Port 2/26/2025
SANTA MARTA Port 2/24/2025
CIENAGA Port 2/20/2025
PUERTO BRISA Port 2/15/2025
SANTA MARTA Port 2/12/2025
CIENAGA Port 1/26/2025
SANTA MARTA Port 1/25/2025
SANTA MARTA ANCH Anchorage 10/27/2024
SANTA MARTA Port 10/26/2024
SANTA MARTA ANCH Anchorage 10/20/2024
SANTA MARTA Port 10/20/2024
SANTA MARTA ANCH Anchorage 10/18/2024
SANTA MARTA Port 10/17/2024
SANTA MARTA ANCH Anchorage 10/7/2024
SANTA MARTA Port 10/7/2024