Name: Cangnan #1 Offshore Wind Power Project - Phase 2
Location: Yanting, Cangnan, Wenzhou, Zhejiang, China. The coordinates are 27.3667, 120.9167 (WGS 84).
Ownership and Operation
Owner: China Resources Power Investment Co., Ltd., a wholly owned subsidiary of China Resources Power Holdings Co., Ltd..
Operator: China Resources Offshore Wind Power (Cangnan) Co., Ltd..
Capacity and Turbines
Phase 1 (already operational):
Nameplate capacity: 400 MW
Turbines: Phase I consists of 24 Envision Energy turbines, each with a 6.25 MW nameplate capacity. Phase I also includes 25 China Shipbuilding Group Haizhuang Wind Power H210-10 MW turbines.
Phase 2 (expansion):
Nameplate capacity: 204 MW
Turbines: The specific turbine details for Phase 2 are not provided in the sources, but it is part of the overall expansion.
Construction and Timeline
Construction Start: The construction of Phase 2 commenced in Q1 2024, following the project announcement in Q1 2023.
Expected Completion: The Phase 2 expansion is expected to be completed by Q4 2027.
Infrastructure and Development
Infrastructure:
The project includes the construction of powerhouses, substations, one 220KV offshore booster station, and one onshore centralized control center.
Installation of wind turbines, transformers, generators, and power controlling systems.
Laying of transmission lines.
Foundation: The turbines will be mounted on fixed monopile foundations and interconnected by 35kV inter-array cables.
Environmental Impact
The overall Cangnan #1 project is expected to generate 1,200,000 MWh of electricity annually, offsetting 800,000 tons of carbon dioxide emissions (CO2) per year.
Additional Details
Area: The project will be spread over an area of 63.7 km².
Developer: China Resources Power Investment Co., Ltd..