Project Overview
- Name: Chiang Sand H1
- Location: Off the coast of Changhua County, Taiwan. This is based on the general area where Ørsted, a major offshore wind developer, has several projects.
- Status: Likely in development or under construction, given the context of other projects in the region.
Capacity and Turbines
- Overall Capacity: 300 MW
- Number of Turbines: This would depend on the turbine capacity. For example, if using 8 MW turbines, the project would require approximately 37.5 turbines (300 MW / 8 MW per turbine).
- Wind Turbine Capacity: Typically, modern offshore wind turbines have capacities ranging from 4 MW to 8 MW or more.
Developer and Ownership
- Developer: Possibly Ørsted, given their significant presence in Taiwan's offshore wind sector.
- Ownership Share: This could be fully owned by Ørsted or involve partnerships, similar to other projects in the region.
Technical Details
- Turbine Specifications: Rotor diameter, hub height, and other technical specifications would be similar to those used in other Ørsted projects. For example, turbines with rotor diameters of around 167 meters and hub heights of over 100 meters are common.
- Grid Connection: The project would involve subsea cables connecting the wind farm to an onshore substation, similar to other offshore wind projects.
Environmental and Regulatory Considerations
- Environmental Impact: The project would have undergone environmental impact assessments and obtained necessary approvals. This might include measures to mitigate effects on local wildlife and ecosystems.
- Regulatory Approvals: The project would need to comply with local and national regulations, including those related to wind sector management and environmental standards.
Economic and Social Impact
- Job Creation: The project would likely create jobs during the construction and operational phases, contributing to local economic development.
- Revenue Generation: The wind farm would generate significant revenue through the sale of electricity, potentially benefiting local communities and stakeholders.
- Carbon Emissions Reduction: The project would contribute to reducing carbon emissions, aligning with global and local renewable energy goals.
Operational Details
- Commissioning: The expected commissioning date would be in the near future, given that it is likely in the development or construction phase.
- Power Transmission: The electricity generated would be transmitted to the grid via subsea cables and onshore infrastructure, similar to other offshore wind projects.