Project Name
- Huaneng Dafeng Phase I Offshore Wind Farm
Location
- Located in the Yellow Sea, Dafeng, Yancheng, Jiangsu, China.
- Coordinates: Latitude 33° 7' 48", Longitude 121° 27' 35.9" (WGS84).
Developer and Owner
- Developed and owned by Huaneng Renewables, a subsidiary of China Huaneng Group. Huaneng Renewables has a 100% stake in the project.
Commissioning
- The project was commissioned in September 2019.
Capacity and Phases
- The total nominal power of the project is 301.6 MW.
- Phase 1: Equipped with Envision Energy EN136-4.2 turbines, consisting of 48 turbines with a 4.2 MW nameplate capacity each.
- Phase 2: Equipped with China Shipbuilding Group Haizhuang Wind Power H151-5.0 turbines, consisting of 20 turbines with a 5 MW nameplate capacity each.
Foundation Type
- The wind turbines are installed on fixed foundations, specifically using an array of monopile foundations.
Energy Production
- The project generates approximately 740,000 MWh of electricity per year, which is enough to power around 500,000 households.
- It offsets about 620,000 tons of carbon dioxide emissions (CO2) annually.
Contractors Involved
- The turbines for Phase 1 are provided by Envision Energy, and for Phase 2 by China Shipbuilding Group Haizhuang Wind Power.
Operational Status
- The project is currently active and has been operational since its commissioning in September 2019.