Dafeng H8-2a

  • Type: Wind Farm
  • Latitude: 33.3220000
  • Longitude: 121.5950000

Project Overview

  • Location: The project is situated in the Yellow Sea, Jiangsu, China.
  • Developer and Owner: The project is developed and owned by Three Gorges New Energy Yancheng Dafeng Co Ltd, a subsidiary of China Three Gorges Corp.

Capacity and Production

  • Total Capacity: The wind farm has a total capacity of 300 MW.
  • Electricity Generation: The project generates approximately 900,000 MWh of electricity per year, which is sufficient to power around 370,000 households.
  • Carbon Offset: The project offsets about 760,000 tons of carbon dioxide (CO2) emissions annually.

Development and Operational Status

  • Construction Start: The construction of the project began in 2021.
  • Commissioning: The project entered into commercial operation in December 2021.
  • Current Status: The project is currently active and operational.

Wind Turbines and Foundations

  • Turbine Models: The wind farm is equipped with two types of turbines from Goldwind Science & Technology:
    • Phase I: 38 turbines of the GW155/4500kW model, each with a 4.5 MW nameplate capacity.
    • Phase II: 20 turbines of the GW 171/6450 model, each with a 6.45 MW nameplate capacity.
  • Foundations: The wind turbines are installed on fixed foundations, specifically an array of monopile foundations.

Contractors and Partners

  • Engineering, Procurement, and Construction (EPC): Goldwind Science & Technology and Shanghai Survey and Design Institute were involved in the EPC services for the project.

Environmental Impact

  • The project contributes significantly to reducing carbon emissions and promoting clean energy, aligning with China's renewable energy goals.

Key Players

  • Developer: Three Gorges New Energy Yancheng Dafeng Co Ltd.
  • Turbine Supplier: Goldwind Science & Technology Co Ltd.
  • EPC Contractors: Goldwind Science & Technology and Shanghai Survey and Design Institute.
Accept Reject