Donghai Bridge Offshore Wind Farm Phase II (Extension) project
- Type: Wind Farm
- Latitude: 30.7740000
- Longitude: 121.9250000
General Information
- Location: The wind farm is situated in the Nanhui District, Pudong Xing District, Shanghai, China.
- Coordinates: Latitude: 30° 46' 11.9", Longitude: 121° 59' 23.9" (WGS84 geodetic system).
- Distance from Shore: Approximately 8 km offshore.
- Depth: The turbines are installed at a depth of about -10 meters.
Project Phases and Details
Phase II (Extension)
- Status: Operational.
- Commissioning Year: 2014 for Phase II, with the extension phases being operational by different dates, but primarily around 2014-2015.
- Nameplate Capacity:
- Part #1: 94,000 kW (27 turbines, each 3,500 kW, though some sources may slightly vary in turbine specifications).
- Part #2: 3,600 kW (1 turbine, Shanghai Electric W3600/116).
- Part #3: 5,000 kW (1 turbine, Sinovel SL 5000/128).
- Total nominal power for Phase II (including extensions): Approximately 102 MW (as per the overall Phase II capacity).
Turbines
- Manufacturers:
- Shanghai Electric: 27 turbines for Part #1 and 1 turbine for Part #2.
- Sinovel: 1 turbine for Part #3.
- Turbine Models:
- Shanghai Electric: W3600/116 (3,600 kW, diameter 116 m) for Part #2.
- Sinovel: SL 5000/128 (5,000 kW, diameter 128 m) for Part #3.
Developers and Operators
- Developer: China Datang Corporation Renewable Power Co.
- Operators:
- Shanghai Donghai Windpower CO LTD (上海东海风力发电有限公司).
- Other operators include CGN Wind Energy Limited (中广核风力发电有限公司), China Datang Corporation (中国大唐集团公司), Shanghai Green Environmental Energy Co., Ltd (上海绿色环保能源有限公司), and State Power Investment Corporation (SPIC) (国家电力投资集团).
Additional Information
- Type: Offshore hard mount turbines.
- Ownership: The project involves multiple owners, including Shanghai Green Environmental Energy Co., Ltd, China Guangdong Nuclear Windpower CO LTD, and Shenergy CO LTD for different phases and extensions.