Prinses Amalia windpark
- Type: Wind Farm
- Latitude: 52.5880000
- Longitude: 4.2240000
Profile for Princess Amalia Wind Farm
General Information
- Name: Princess Amalia Wind Farm (also known as Prinses Amaliawindpark in Dutch and previously as Q7 Wind Farm).
- Location: Approximately 23 km off the coast of IJmuiden, Netherlands, on the Dutch Continental Shelf at block Q7.
- Owner: Eneco Holding N.V..
- Operator: Eneco.
Specifications
- Total Nominal Power: 120 MW.
- Number of Turbines: 60 Vestas V80-2.0 MW wind turbines.
- Turbine Details:
- Power: 2 MW each
- Rotor Diameter: 80 meters
- Hub Height: 60 meters
- Tip Height: 100 meters.
- Turbine Details:
- Foundation:
- Type: Monopile foundations
- Diameter: Approximately 4 meters
- Length: Over 50 meters
- Weight: 320 tonnes
- Installation Depth: 30 meters into the seabed at water depths of 19-24 meters.
Construction and Development
- Project Initiation: The project began in 1998 with firms such as E-connection, Vestas, Mammoet van Oord, Smulders, and Fabricom involved.
- Permission and Agreements:
- Permission to construct and operate was issued in February 2002.
- An agreement for the takeover of the rights was signed by Econcern and Energy Investments Holding in October 2004.
- Eneco joined the project in March 2005.
- Construction Phase: Started in 2005-06 and completed by April 2008.
- Key Activities:
- Installation of onshore sea cables and offshore foundations began in October 2006.
- Installation of wind turbines was carried out from May 2007 to November 2007 by Vestas.
- The wind farm was connected to the Dutch grid by December 2007.
- Key Activities:
Operational Details
- Commissioning: Officially opened on June 4, 2008.
- Annual Production: Approximately 435,000 MWh (or 422 GWh as per some sources), sufficient to power around 125,000 households.
- CO2 Emissions Reduction: The wind farm avoids CO2 emissions by about 225,000 tonnes per annum.
- Maintenance and Operations:
- Vestas is contracted for operations and maintenance services.
- The maintenance port is located at IJmuiden.
Infrastructure and Contractors
- Main Vessels Used: Jumping Jack and Sea Jack.
- Contractors:
- Van Oord: Engineering, procurement, and construction services for foundations, electrical infrastructure, and scour protection.
- Vestas: Turbine supplier and installation of towers and nacelles.
- Smulders: Monopile foundations and transition pieces.
- ABB and Van Oord: Installation of sea cables.
Grid Connection
- Grid Operator: TenneT.
- Substations:
- Offshore substation on a monopile foundation with the topside by Bladt Industries & SEMCO (DK) and monopile by Smulders (BE).
- Onshore substation located at Wijk aan Zee.
Environmental Considerations
- The turbines were installed at a depth of 19-24 meters to reduce the impact on migrating birds, and a distance of 550 meters is maintained between the turbines.
Flag | Name | Type | Date |
---|---|---|---|
WINDCAT 25 | Other | 11/15/2024 | |
BRA7 JADE | Fishing | 11/14/2024 | |
WINDCAT 25 | Other | 11/13/2024 | |
WINDCAT 25 | Other | 11/8/2024 | |
WINDCAT 25 | Other | 11/6/2024 | |
WINDCAT 25 | Other | 11/5/2024 | |
WINDCAT 25 | Other | 11/3/2024 | |
WINDCAT 25 | Other | 10/26/2024 | |
WINDCAT 25 | Other | 10/25/2024 | |
WINDCAT 25 | Other | 10/22/2024 | |
WINDCAT 25 | Other | 10/19/2024 | |
WINDCAT 25 | Other | 10/18/2024 | |
WINDCAT 25 | Other | 10/15/2024 | |
WINDCAT 25 | Other | 10/12/2024 | |
WINDCAT 25 | Other | 10/3/2024 | |
WINDCAT 25 | Other | 10/3/2024 | |
WINDCAT 25 | Other | 9/22/2024 | |
WINDCAT 32 | Other | 9/21/2024 | |
WINDCAT 25 | Other | 9/21/2024 | |
WINDCAT 25 | Other | 9/20/2024 | |
WINDCAT 25 | Other | 9/19/2024 | |
WINDCAT 25 | Other | 9/18/2024 | |
WINDCAT 25 | Other | 9/15/2024 | |
WINDCAT 25 | Other | 9/15/2024 | |
WINDCAT 18 | Other | 9/14/2024 | |
WINDCAT 25 | Other | 9/8/2024 | |
WINDCAT 18 | Other | 9/7/2024 | |
WINDCAT 25 | Other | 9/7/2024 | |
WINDCAT 25 | Other | 9/6/2024 | |
WINDCAT 25 | Other | 9/6/2024 | |
WINDCAT 18 | Other | 9/6/2024 | |
WINDCAT 18 | Other | 9/4/2024 | |
WINDCAT 18 | Other | 9/3/2024 | |
WINDCAT 25 | Other | 9/3/2024 | |
WINDCAT 25 | Other | 9/2/2024 | |
WINDCAT 25 | Other | 9/2/2024 | |
WINDCAT 25 | Other | 8/31/2024 | |
WINDCAT 18 | Other | 8/31/2024 | |
WINDCAT 25 | Other | 8/30/2024 | |
WINDCAT 18 | Other | 8/30/2024 | |
WINDCAT 25 | Other | 8/30/2024 | |
WINDCAT 32 | Other | 8/30/2024 | |
WINDCAT 18 | Other | 8/30/2024 | |
WINDCAT 32 | Other | 8/30/2024 | |
WINDCAT 18 | Other | 8/29/2024 | |
WINDCAT 25 | Other | 8/29/2024 | |
WINDCAT 18 | Other | 8/29/2024 | |
WINDCAT 18 | Other | 8/29/2024 | |
WINDCAT 18 | Other | 8/28/2024 | |
WINDCAT 25 | Other | 8/27/2024 |