Prinses Amalia windpark

  • Type: Wind Farm
  • Latitude: 52.5880000
  • Longitude: 4.2240000

Profile for Princess Amalia Wind Farm

General Information

  • Name: Princess Amalia Wind Farm (also known as Prinses Amaliawindpark in Dutch and previously as Q7 Wind Farm).
  • Location: Approximately 23 km off the coast of IJmuiden, Netherlands, on the Dutch Continental Shelf at block Q7.
  • Owner: Eneco Holding N.V..
  • Operator: Eneco.

Specifications

  • Total Nominal Power: 120 MW.
  • Number of Turbines: 60 Vestas V80-2.0 MW wind turbines.
    • Turbine Details:
      • Power: 2 MW each
      • Rotor Diameter: 80 meters
      • Hub Height: 60 meters
      • Tip Height: 100 meters.
  • Foundation:
    • Type: Monopile foundations
    • Diameter: Approximately 4 meters
    • Length: Over 50 meters
    • Weight: 320 tonnes
    • Installation Depth: 30 meters into the seabed at water depths of 19-24 meters.

Construction and Development

  • Project Initiation: The project began in 1998 with firms such as E-connection, Vestas, Mammoet van Oord, Smulders, and Fabricom involved.
  • Permission and Agreements:
    • Permission to construct and operate was issued in February 2002.
    • An agreement for the takeover of the rights was signed by Econcern and Energy Investments Holding in October 2004.
    • Eneco joined the project in March 2005.
  • Construction Phase: Started in 2005-06 and completed by April 2008.
    • Key Activities:
      • Installation of onshore sea cables and offshore foundations began in October 2006.
      • Installation of wind turbines was carried out from May 2007 to November 2007 by Vestas.
      • The wind farm was connected to the Dutch grid by December 2007.

Operational Details

  • Commissioning: Officially opened on June 4, 2008.
  • Annual Production: Approximately 435,000 MWh (or 422 GWh as per some sources), sufficient to power around 125,000 households.
  • CO2 Emissions Reduction: The wind farm avoids CO2 emissions by about 225,000 tonnes per annum.
  • Maintenance and Operations:
    • Vestas is contracted for operations and maintenance services.
    • The maintenance port is located at IJmuiden.

Infrastructure and Contractors

  • Main Vessels Used: Jumping Jack and Sea Jack.
  • Contractors:
    • Van Oord: Engineering, procurement, and construction services for foundations, electrical infrastructure, and scour protection.
    • Vestas: Turbine supplier and installation of towers and nacelles.
    • Smulders: Monopile foundations and transition pieces.
    • ABB and Van Oord: Installation of sea cables.

Grid Connection

  • Grid Operator: TenneT.
  • Substations:
    • Offshore substation on a monopile foundation with the topside by Bladt Industries & SEMCO (DK) and monopile by Smulders (BE).
    • Onshore substation located at Wijk aan Zee.

Environmental Considerations

  • The turbines were installed at a depth of 19-24 meters to reduce the impact on migrating birds, and a distance of 550 meters is maintained between the turbines.
Flag Name Type Date
WINDCAT 25 Other 11/15/2024
BRA7 JADE Fishing 11/14/2024
WINDCAT 25 Other 11/13/2024
WINDCAT 25 Other 11/8/2024
WINDCAT 25 Other 11/6/2024
WINDCAT 25 Other 11/5/2024
WINDCAT 25 Other 11/3/2024
WINDCAT 25 Other 10/26/2024
WINDCAT 25 Other 10/25/2024
WINDCAT 25 Other 10/22/2024
WINDCAT 25 Other 10/19/2024
WINDCAT 25 Other 10/18/2024
WINDCAT 25 Other 10/15/2024
WINDCAT 25 Other 10/12/2024
WINDCAT 25 Other 10/3/2024
WINDCAT 25 Other 10/3/2024
WINDCAT 25 Other 9/22/2024
WINDCAT 32 Other 9/21/2024
WINDCAT 25 Other 9/21/2024
WINDCAT 25 Other 9/20/2024
WINDCAT 25 Other 9/19/2024
WINDCAT 25 Other 9/18/2024
WINDCAT 25 Other 9/15/2024
WINDCAT 25 Other 9/15/2024
WINDCAT 18 Other 9/14/2024
WINDCAT 25 Other 9/8/2024
WINDCAT 18 Other 9/7/2024
WINDCAT 25 Other 9/7/2024
WINDCAT 25 Other 9/6/2024
WINDCAT 25 Other 9/6/2024
WINDCAT 18 Other 9/6/2024
WINDCAT 18 Other 9/4/2024
WINDCAT 18 Other 9/3/2024
WINDCAT 25 Other 9/3/2024
WINDCAT 25 Other 9/2/2024
WINDCAT 25 Other 9/2/2024
WINDCAT 25 Other 8/31/2024
WINDCAT 18 Other 8/31/2024
WINDCAT 25 Other 8/30/2024
WINDCAT 18 Other 8/30/2024
WINDCAT 25 Other 8/30/2024
WINDCAT 32 Other 8/30/2024
WINDCAT 18 Other 8/30/2024
WINDCAT 32 Other 8/30/2024
WINDCAT 18 Other 8/29/2024
WINDCAT 25 Other 8/29/2024
WINDCAT 18 Other 8/29/2024
WINDCAT 18 Other 8/29/2024
WINDCAT 18 Other 8/28/2024
WINDCAT 25 Other 8/27/2024
Accept Reject