Project Name
Rudong H13 Offshore Wind Power Project
Location
The project is located in the Yellow Sea, Jiangsu Province, China.
Project Developer and Owner
The project is being developed and owned by Rudong Zhixin Offshore Wind Power.
Total Capacity
The Rudong H13 Offshore Wind Power Project has a total installed capacity of 150 MW.
Project Status
As of the latest updates, the project is currently in the permitting stage. It is expected to be developed in a single phase and is anticipated to be commissioned in 2025.
Turbines and Technology
The wind power project will consist of 30 wind turbines, each with a nameplate capacity of 5 MW.
Electricity Generation
Once operational, the project is expected to generate approximately 421,100 MWh of electricity annually.
Project Area
The wind farm will be spread over an area of 28 square kilometers (kmĀ²).
Infrastructure
The project will be interconnected using 35kV inter-array cables.
Project Cost
The estimated cost for the Rudong H13 Offshore Wind Power Project is around $405.557 million.
Development Timeline
While the exact start date of construction is not specified, the project is expected to be completed and commissioned by 2025.