Rudong H13 Offshore Wind Power Project

Location

The project is located in the Yellow Sea, Jiangsu Province, China.

Project Developer and Owner

The project is being developed and owned by Rudong Zhixin Offshore Wind Power.

Total Capacity

The Rudong H13 Offshore Wind Power Project has a total installed capacity of 150 MW.

Project Status

As of the latest updates, the project is currently in the permitting stage. It is expected to be developed in a single phase and is anticipated to be commissioned in 2025.

Turbines and Technology

The wind power project will consist of 30 wind turbines, each with a nameplate capacity of 5 MW.

Electricity Generation

Once operational, the project is expected to generate approximately 421,100 MWh of electricity annually.

Project Area

The wind farm will be spread over an area of 28 square kilometers (kmĀ²).

Infrastructure

The project will be interconnected using 35kV inter-array cables.

Project Cost

The estimated cost for the Rudong H13 Offshore Wind Power Project is around $405.557 million.

Development Timeline

While the exact start date of construction is not specified, the project is expected to be completed and commissioned by 2025.