Shandong Changyi Laizhou Bay - phase 1

  • Type: Wind Farm
  • Latitude: 37.2670000
  • Longitude: 119.5170000

Project Name

  • Shandong Changyi Laizhou Bay Offshore Wind Farm

Location

  • The project is located in the Bohai Sea, Shandong, China.

Developer and Owner

  • The project is being developed by Three Gorges New Energy Shandong Changyi Power Generation.
  • It is currently owned by China Three Gorges New Energy with a 100% stake.

Capacity and Turbines

  • The overall project has a planned capacity of 702 MW.
  • Phase 1 of the project, referred to as Shandong Changyi Laizhou Bay Phase I, will consist of 50 turbines, each with a 6MW nameplate capacity. The entire project will include 67 turbines in total.

Foundation and Interconnection

  • The turbines will be mounted on fixed-type foundations.
  • The turbines will be interconnected by 35kV inter-array cables.

Development Status

  • The project construction was expected to commence in 2022.
  • It was anticipated to enter into commercial operation by December 2022, although the current status might be partially active as it is being developed in multiple phases.

Environmental Impact

  • The project is expected to generate 175,000 MWh of electricity annually.
  • This will help offset approximately 1,100,000 tons of carbon dioxide (CO2) emissions per year.

Contractors Involved

  • The turbines for the project will be provided by Goldwind Science & Technology Co Ltd.