Yuedian Yangjiang Qingzhou II

  • Type: Wind Farm
  • Latitude: 21.0310000
  • Longitude: 111.6010000

Project Name

  • Yuedian Yangjiang Qingzhou II Offshore Wind Farm

Location

  • Located in Yangxi, Yangjiang, Guangdong, China.
  • Coordinates: Approximately 21.4804° N, 111.4686° E (WGS 84).

Status

  • The wind farm is currently under construction, with a planned commissioning year of 2024.

Capacity and Turbines

  • Nameplate Capacity: 600 MW or 599.5 MW as per some sources.
  • Number of Turbines: 54 turbines.
    • Turbine Model: Guangdong Mingyang MySE11-203.
    • Turbine Specifications: Each turbine has a power output of 11,000 kW and a rotor diameter of 230 meters.

Developer and Operator

  • Developer: Guangdong Wind Power Generation Co or Guangdong Energy Yangjiang Windpower CO LTD (广东粤电阳江海上风电有限公).
  • Operator: Guangdong Energy Yangjiang Windpower CO LTD.

Type

  • Type of Wind Farm: Offshore hard mount.

Total Nominal Power

  • The total nominal power of the wind farm is approximately 594,000 kW (or 594 MW), although the nameplate capacity is slightly lower at 600 MW due to rounding.

Additional Information

  • The project is part of the broader efforts to develop offshore wind energy in the South China Sea, specifically in the Guangdong province.